Building extension with laboratory installation
With the extension of Building G for Bachem in Bubendorf, an open laboratory zone was created, which promotes interaction between the employees and ensures in-process control of production. Thanks to the flexible equipment, it is possible to react quickly to new requirements.
![](https://laborplaner.ch/wp-content/uploads/2021/10/IMG_8350-HDR.jpg)
![](https://laborplaner.ch/wp-content/uploads/2021/10/IMG_8326-HDR.jpg)
![](https://laborplaner.ch/wp-content/uploads/2021/10/IMG_8356-HDR.jpg)
pictures: Sascha Meier Fotografie
![](https://laborplaner.ch/wp-content/uploads/2020/11/025_referenz_lp.png.pagespeed.ce.gBOTZz2wJT.png)
CUSTOMER
Bachem AG
![](https://laborplaner.ch/wp-content/uploads/2020/11/026_referenz_lp.png.pagespeed.ce.fMZYGLQaSQ.png)
Location
Bubendorf, Switzerland
![](https://laborplaner.ch/wp-content/uploads/2020/11/027_referenz_lp.png.pagespeed.ce.kRmDtarrbA.png)
ARCHITECT
furler + partner architektur ag
![](https://laborplaner.ch/wp-content/uploads/2020/11/028_referenz_lp.png.pagespeed.ce.4qhkiXUGug.png)
SURFACE AREA OF THE LAB
307 m2
![](https://laborplaner.ch/wp-content/uploads/2020/11/029_referenz_lp.png.pagespeed.ce.tQdlcqo-qM.png)
PROJECT DURATION
2018 – 2021
![](https://laborplaner.ch/wp-content/uploads/2020/11/030_referenz_lp.png.pagespeed.ce.PcXYOgbjP3.png)
HIGHLIGHTS
Modern open-space laboratory landscape. Highly installed HPLC instrument room with flexible laboratory equipment for sustainable use.